Skip to main content

Read our primer articles: OEE | RCM | Lean Manufacturing | Kaizen Events | FMEA

I have a question for anyone with a boiler background, I would like to know the implications of shutting down a boiler with a PLC, basically my problem is this, we have a boiler here which is under observation every 8 hours,but to ensure this factory is more efficient I want to be able to shut down the boiler with a volt free contact from our main factory PLC (this contact is already available). So I would like to know if it is possible and what considerations I would need to take into account? I hope someone can help me out! Thanks
Original Post
Post
attend Reliable Plant 2024
×
×
×
×
Link copied to your clipboard.
×